When GCC project teams approach rooflight specification the right way, they don’t select a single product off a catalogue — they configure a system, step by step, before the slab is poured.
At Shams Daylighting Solutions, we support architects, project managers and procurement teams across UAE and Saudi Arabia in making these four decisions correctly and at the right stage of design.
<h2>Step 1 — Upstand Type</h2>
The upstand is the structural interface between the rooflight and the slab. Options include PVC Standard, PVC 90°, Metal Base and Circular. The choice determines thermal break performance, pitch tolerance and compatibility with the structural slab. Specifying the wrong upstand type is one of the most costly corrections in rooflight installation.
<h2>Step 2 — Dome Material</h2>
Two primary options: PMMA acrylic (UV-stable on both faces, impact-resistant, available in clear and opal) and Compact Polycarbonate (fire class B-s1,d0 — no flaming droplets, suited for fire-rated specifications in occupied buildings).
For GCC climate conditions, the HeatStop solar-control finish is the most impactful upgrade available at this stage. It reduces reflected radiation by 62% and indoor heat build-up by 38%, with a direct measurable reduction in cooling load — and therefore in long-term energy cost.
<h2>Step 3 — Opening System</h2>
Fixed (maximum thermal performance and simplicity), Manual spindle/crank (no power required, low maintenance, reliable in remote locations), or Electric (BMS-compatible, rain sensor ready, suitable for smart building integration). The opening system determines ventilation strategy, maintenance access and the level of building automation integration.
<h2>Step 4 — Glazing Layers</h2>
Single, double or triple wall. Each additional layer increases thermal resistance and reduces condensation risk — particularly relevant during GCC transition seasons when internal temperatures and external humidity create the most demanding performance conditions.
<h2>Four Decisions. One System. Specified Before the Structure Is Up.</h2>
The teams that get this right make these four decisions early — during concept design, not during fit-out. When the specification is locked before the slab is poured, the installation is straightforward and the performance is predictable.
If your team is working on a GCC project where the rooflight specification is still open, we are happy to walk through the configuration options with you.