Most GCC villa buyers don’t read the tender document.
They don’t know what SHGC means. They don’t know what an upstand is. They don’t know the difference between a fixed flat roof window and an operable one.
But they know exactly what they expected when they signed the SPA.
They expected a bright master bedroom. They expected a bathroom that didn’t feel like a basement. They expected a home that breathes.
And then handover day arrives.
The skylight is there — but there’s no blind. In August in Dubai, the room reaches 42°C by 10 AM.
The opening mechanism is there — but it’s on a wall switch, disconnected from the KNX system. The smart home they paid for doesn’t include the roof.
The daylight is there — but the upstand is 90°, not angled. The light hits the ceiling at noon and disappears by 3 PM.
None of these are product failures. They are specification failures — decisions made months before handover, by people who never saw the finished room.
The buyer doesn’t file a complaint about the upstand angle. They file a complaint about the room.
And that complaint lands on the developer’s desk — not the consultant’s, not the contractor’s.
The specification conversation needs to happen at concept stage, with the right product information, before the slab is poured and before the tender goes out.
When your buyers walk through on handover day, which rooms are already answering their questions — and which ones are creating them?
Shams Daylighting Solutions (UAE) www.shamsds.ae
Learn more about VELUX New Generation — or contact our team at hello@shamsds.ae.