By the time the slab is poured, most of your daylighting options are already gone.
In UAE residential projects, the specification window is narrower than it looks. Wait until site stage and you’re forced to fit a window to the hole — instead of designing the hole for the right system.
The projects that perform best — thermally, visually, at handover — are the ones where the roof opening was defined at the design table, with the glazing configuration driving the structure. Not the other way around.
A flat roof window specified late means one thing: compromise. Wrong SHGC for the orientation. Wrong upstand height for the waterproofing. Wrong size for EN 17037 compliance. And a developer’s name on a villa that overheats every August.
The specification decision is a risk decision. And like every risk decision, the cost of getting it wrong compounds over time.
Architects and project directors: at what stage do you fix skylight dimensions — design, or after the structure is up?
—
Learn more about VELUX Flat Roof Windows — or contact our team at hello@shamsds.ae.