The Most Expensive Decision In A GCC Villa Isn’t The Finish. It’s…

Most premium villa projects in the UAE are decided at handover.

But the decisions that define how that villa actually feels to live in — the light, the air, the thermal comfort — were made months earlier, before the structure existed.

A flat roof window specified at concept stage can be designed to the opening. The opening is sized for the system. The upstand is specified for the climate. The glazing is selected for SHGC, not just aesthetics.

A flat roof window specified after the slab is poured is a compromise — fitted to what’s already there, not to what the resident will experience for the next 30 years.

The difference in comfort is measurable. The difference in cost is not small.

In UAE residential projects, late specification of roof daylighting systems typically results in remediation costs between AED 60,000 and AED 147,000 per opening — structural rework, waterproofing, finishing. That’s before accounting for the delay.

The villa that holds its value — and its reputation — is the one where the daylighting decision was made at the design table, not on site.

A 10-year contractual warranty and 35-year performance warranty on the system only means something if the system was specified correctly from the start.

Architects and project directors: at what stage does your team lock the roof daylighting specification — concept design, or after the structure is defined?

Shams Daylighting Solutions (UAE) 🌐 www.shamsds.ae

Learn more about VELUX Flat Roof Windows — or contact our team at hello@shamsds.ae.