A cost overrun on a GCC project rarely starts with a change order. It starts with a skylight that wasn’t in the procurement schedule.
The flat roof window — the upstand, the glazing unit, the blind — is a configured system. VELUX lead times run 6 to 8 weeks from order confirmation. If the cost manager hasn’t priced it at tender stage, the number that lands later is rarely the one in the budget.
The ZCU upstand — 150mm thermally broken aluminium, sized to the structural opening — needs to be confirmed at design freeze. Miss that window and you’re pricing a remediation, not a product.
The cost managers who close projects within budget tend to lock the skylight line item at tender. Not at value engineering. Not at handover.
At Shams Daylighting, we work with cost managers and QS teams across UAE and KSA to provide accurate pricing and lead time data at tender stage — so the number in the cost plan is the number that holds.
Learn more about our flat roof window range: https://shamsds.ae/new-generation/
Contact: hello@shamsds.ae